The network drops mid-shift
Outages stop barcode scanners, label printers and production management systems.
A network that withstands dust, heat and vibration — without stopping the line. SysNet designs fibre backbones, industrial switches and Wi-Fi for production halls, warehouses and site offices.
Outages stop barcode scanners, label printers and production management systems.
Copper cable runs out of reach, signals degrade and new buildings are hard to connect.
Ordinary office equipment fails quickly on the production floor.
Fibre links between halls, warehouse and offices with spare capacity for growth.
Read moreWide-temperature DIN-rail equipment for control cabinets and production areas.
Read moreCoverage for warehouses, yards and cold stores, with roaming for forklifts and handhelds.
Read moreLAN installation across offices and the production floor, with standardised racks and structured cabling.
Full Wi-Fi coverage of a high-density exhibition space, centrally managed through a controller.
Supply of servers and workstations plus rollout of the internal network for a healthcare facility.
For an office with fewer than 50 network points, installation usually takes 5 to 10 working days. Factories and multi-storey buildings need 3 to 6 weeks depending on cable volume and site conditions. The detailed schedule is committed in the contract after the survey.
No. The site survey, proposed approach and itemised quote are free in Ho Chi Minh City and neighbouring provinces. For projects further away, we agree travel costs with you beforehand.
Leave your details and a SysNet engineer will get in touch within 24 working hours to survey your site and recommend the right approach.