Takahiro
LAN installation across offices and the production floor, with standardised racks and structured cabling.
- Network points
- 120+
- Duration
- 4 weeks
Full Wi-Fi coverage of a high-density exhibition space, centrally managed through a controller.
Describe your current setup and a SysNet engineer will survey it and propose the right approach.